…always there
During the commissioning procedure, the STU will be "upped" on the landline.
Call the ARC, preferably using the same line as the STU, and ask them to
commission the system ("Up the STU").
You will hear a short series of ‘chirps’ on the line. The green STU Status LED
will give a short flutter each time a landline message, heard as a "chirp", is
sent or received.
When the ARC confirms that the system is commissioned the green STU Status
LED should flash every 5 seconds. The red STU Status LED may either be off, or
produce short flashes every 10 seconds. The short flashes indicate the number of
alarms triggered.
If, during the commissioning procedure, power to the STU is interrupted, even
momentarily, the above procedure will have to be repeated.
Testing the System
Once the STU has been commissioned, all of the used alarm inputs and relay
outputs should be tested. To test the alarm inputs you must be in contact
with the ARC.
Each alarm should be tested in the following manner:
a) Trigger the alarm (the red STU Status LED should give one quick flash
every 10 seconds signifying one alarm has been triggered).
b) Ask the ARC to confirm that it has received the alarm message.
c) Ask the ARC to acknowledge the alarm.
d) Remove the alarm trigger (the red STU Status LED should stop
flashing).
e) Ask the ARC to confirm that it has received the reset message.
f) Ask the ARC to acknowledge the reset.
If personal attack buttons form part of the system they must be tested as
above.
If used, the Control Output should be tested as follows:
a) Ask the ARC to turn on the Control Output.
b) Confirm that Control Output is activated (e.g. Remote Reset).
c) Ask the ARC to turn off the Control Output.
d) Confirm that the Control Output is deactivated.
If used, the RPS output should be tested as follows:
a) Trigger the alarm that has been designated as the opening/closing
channel.
b) Confirm that the RPS warning device is activated and ask the ARC to
confirm that it has received the opening message.
c) Ask the ARC to acknowledge the opening.
d) Confirm that the RPS warning device is de-activated.
If enabled, the Line Fault output should be tested as follows: